Meadow Garden Estates, Cedar Springs 

Occasionally residential homes get started simultaneously in certain subdivisions; this requires us to do multiple things at a time, usually in two’s or three’s. However, we had the unique opportunity to do FIVE foundations at the same time in Meadow Garden Estates in Cedar Springs in March of 2024.

This would not be possible without careful scheduling and planning between our footing and wall crews, as well as the crane operators and JDE Concrete Pumping. 900 lineal feet of footing and wall were poured between all 5 foundations, as well as 118 yards of concrete.

JDE Concrete Pumping provided a 36 meter boom pump to help place the concrete.

For the boom pump’s detailed specifications, Scroll Down.

Dcim101mediadji 0341.jpg

Dcim101mediadji 0360.jpg

Dcim101mediadji 0487.jpg

Dcim101mediadji 0495.jpg

Dcim101mediadji 0502.jpg

Img 3171

Img 3172

Img 3182

Img 3183

Img 3187

Img 3190

Let’s dive into the details of the 36-meter boom pump provided by JDE Concrete Pumping:

Boom Design

Z-Fold

Horizontal Reach

35.1 meters (115’2″)

Vertical Reach

34.9 meters (114’6″)

Reach Depth

28.8 meters (94’6″)

Boom Length

1st Section: 9.8 meters (32’1″)
2nd Section: 8.3 meters (27’3″)
3rd Section: 8.3 meters (27’3″)
4th Section: 8.7 meters (28’7″)

End Hose Length

3.05 meters (10’)

Boom Articulation

1st Section: -2° to 83°
2nd Section: 180°
3rd Section: 245°
4th Section: 230°

Rotation

365°

Delivery Line Diameter

125 mm (5″)

Electric System

AC460V / 60Hz

Electric Motor

22 kW

This 36-meter boom pump offers versatility, allowing you to operate efficiently even in tight spaces. The Z-Fold design ensures optimum flexibility, and the lower unfolding height makes it suitable for various job sites. Whether you’re working under low ceiling heights or in congested areas, this pump delivers.

BUILD TO LAST WITH JDE CONCRETE CONTRACTORS