JDE Concrete has poured commercial foundations and footings across West Michigan for over 29 years, engineered specifically for the region’s freeze-thaw cycles, variable soil conditions, and the load requirements that come with warehouses, retail buildings, and industrial facilities.
Our foundation and footings work includes strip footings, spread footings, and full foundation systems for new commercial construction, additions, and industrial builds. Every pour is engineered to the load-bearing requirements of the structure above it, with mix designs and reinforcement selected to match the specific demands of the project rather than a generic default spec.
Michigan’s climate is unforgiving on a foundation that isn’t built for it. Frost heave and freeze-thaw cycling can crack or shift an improperly poured footing within a few winters, which is why we coordinate closely with general contractors and developers on scheduling, site access, and inspection timelines, using our own fleet of boom pumps, line pumps, and conveyor trucks to keep large or logistically complex pours on schedule.
Whether you’re breaking ground on a new commercial building, adding on to an existing facility, or replacing a failing foundation, JDE Concrete provides the structural expertise and equipment capacity to get it done right the first time.
What we handle:
- Strip and spread footings
- Full foundation systems for new commercial construction
- Foundation work for additions and industrial builds
- Engineered mix design for site-specific load requirements
- ACI-certified cold weather pour procedures
- Subgrade preparation and drainage planning
Why Choose JDE Concrete?
Commercial Concrete Projects
Q&A Section
Get a Free Estimate
Tell us about your project and we’ll get back to you shortly with a detailed commercial estimate.
For any inquiries or to discuss your needs in detail, contact us today.
CONTACT INFO
- Main Facility, Jenison, MI
- 1961 Pine Ridge Dr. S.W. Jenison, MI 49428
- (616) 551-2126
- fax: (616) 323-3684





